The Level 3 Activity List Batch Update feature allows the status of one or more Level 3 Activities to be changed directly from the Level 3 List View at the bottom a Level 2 record.
The process is illustrated here:
- Select the appropriate records and click the Approve button (Note the initial status is Submitted)
- Click OK to accept the change:
- The result with status changed to Approved for Invoicing:
Configuring Activity List Batch Update
There are 2 settings that must be configured to use the Activity List Batch Update
1) Manager Permission:
The Roles permitted to use this feature must be selected for each UTA via the Manager Permission setting under Roles & Permissions:
2) UTA Application Configuration settings:
The destination Status must be set on the Application Configuration page, found within the Level 3 Settings section:
The label for the button can also be defined in this section.
- Note: if no label is entered the default label of Approve will be used.
Notes
- If the Batch Update Level 3 to: Status setting on the Application Configuration page is set to --Disabled-- the button will not appear.
- Only one Status can be set in this manner.