Difference between revisions of "Sscalculation"
From SmartWiki
(→Using sscalculation in a List) |
Andy Nguyen (talk | contribs) |
||
Line 32: | Line 32: | ||
so the 0 at the end ensures that the statement evaluated doesn't end with a plus sign (which will fail). | so the 0 at the end ensures that the statement evaluated doesn't end with a plus sign (which will fail). | ||
+ | * If you need to pull information from the level 1 when you are at level 2 within the sscalculation tag, you can use the parent keyword | ||
+ | <pre> | ||
+ | <!--@sscalculation(@year(parent.fullstartdate)@)--> | ||
+ | </pre> | ||
[[Category:Variables]] | [[Category:Variables]] |
Revision as of 22:10, 30 March 2010
Sscalculation is a variable syntax for:
This works similar to sslogic but will do calculations based on the formula you provide. It works as follows:
<!--@sscalculation(@field@*0.05)-->
This will return the computed value of @field@*0.05 and replaces the sscalculation tag.
This way you can do calculations right on the web page views without having to use javascript which solves the problem on PDF and javascript.
This method uses MySQL syntax, so you can do any MySQL functions like concat(...), format(...), round(...), etc.
Using sscalculation in a List
To obtain a Sum (for example) of the values in a Custom Field for all transactions associated with a Company/Contact using sscalculation:
<!--@sscalculation( [#(?object=transaction;)$add this$+#]0)-->
- Important: There must be a space prior to the opening square bracket.
- Also: if you are finding the sum don't forget the zero at the end of the statement. For example, if there are transactions with values of 10, 15 and 20 the statement between the square brackets would be translated as follows:
- [#(?object=transaction;)$add this$+#] becomes 10+15+20+
so the 0 at the end ensures that the statement evaluated doesn't end with a plus sign (which will fail).
- If you need to pull information from the level 1 when you are at level 2 within the sscalculation tag, you can use the parent keyword
<!--@sscalculation(@year(parent.fullstartdate)@)-->