Difference between revisions of "Scheduler"

From SmartWiki
Jump to: navigation, search
Line 9: Line 9:
 
==Frequency==
 
==Frequency==
 
Different options to automate scheduling:
 
Different options to automate scheduling:
 +
 
===Every Day===
 
===Every Day===
 
+
===Every Week===
===Every Week==
 
 
 
 
===Every Month===
 
===Every Month===
 
 
===Every Year===
 
===Every Year===
 
 
===Custom===
 
===Custom===
 
 
 
==Important field settings==
 
==Important field settings==
===File/Schedule Completed==
+
* '''File/Schedule Completed''' - 
 
+
* '''Last Run''' - 
===Last Run===
+
* '''Last Modified''' - 
 
+
* '''Last Modified By''' - 
===Last Modified==
 
 
 
===Last Modified By===
 
  
 
=Appendix=
 
=Appendix=
Line 46: Line 38:
  
 
[[Category:Data Import]]
 
[[Category:Data Import]]
 
  
 
[[Category:Global Settings]]
 
[[Category:Global Settings]]

Revision as of 12:59, 25 October 2021


Construction warning.png Please note that this page is currently under construction. There is more information to come.

Overview

Available after November 2021 upgrade.
A robust automated scheduling option is now available for Autoloaders, Archive Schedule and Report export.

Configuration - Essentials

Frequency

Different options to automate scheduling:

Every Day

Every Week

Every Month

Every Year

Custom

Important field settings

  • File/Schedule Completed
  • Last Run
  • Last Modified
  • Last Modified By

Appendix

Schedule Settings

  1. Existing Autoloaders and Archive Schedules are automatically migrated except for the Start Schedule From field. When user goes into an existing configuration, the previous schedule will be converted into the new schedule settings and they will be prompted to enter the Start Date upon saving.
  2. Existing Report Export will require the user to use toggle to select and use the new scheduler. The toggle button will disappear once it has been resaved and converted into the new scheduler.
  3. Schedules are run at server time. If user settings have a different time zone from the server time zone, the Next Schedule Run time will display both time zones.
  4. If chosen schedule is every month on the 31st @5pm, all other months without 31 will run on the last day of the month i.e. Feb 28, April 30.  The date will be shown o the Next Scheduled Run date.
  5. When setting up schedules, multiple days and hours are allowed.
  6. For Frequency = Custom, you can enter days apart (integer) but can only select specific hour to run.  The calculation of the next scheduled run is based on the availability of Start Date, Next Scheduled Run and Last Run dates i.e. If you are modifying a schedule which already have a Next Schedule Run date set up in the future, but Start Date is in the past, calculation will be different. So you will have to double check the Next Schedule Run date after you save the settings.
  7. Datepicker of Start Schedule From date field will only allow today and future dates.

Missed Runs

  • New Scheduler will take into account missed runs ON THE SAME DAY (If Next Scheduled Run is available). i.e. CASE#1:  If the Next Scheduled Run date for the Autoloader is 2021-08-29 11:00 AM, but Autoloader or Gort was stuck at this time and service resumes at 2021-08-29 14:15, then Scheduler will process the Next Scheduled Run date = 2021-08-29 11:00 AM.  CASE#2:  If the Next Scheduled Run date for the Autoloader is 2021-08-29 11:00 AM, but Autoloader or Gort was stuck at this time and service resumes at 2021-08-30 09:00 AM, the missed process will not run.
  • After each run, system will calculate the Next Scheduled Run for the process.